How To Organize Your Home Renovation
When it comes to decoration, for those who are decoration for the first time and have not had much contact with this industry before, it is simply "more difficult than the book" when they were students. The time cycle is long, less than one or two months, more than half a year or even longer, involves more matters, determine the decoration needs, design, make a budget, find the decoration team, buy decoration materials, acceptance of each link, etc., is a cumbersome headache process, no matter which link goes wrong, will affect the decoration experience.
Of course, decoration is actually a process of gradually approaching happiness, looking at your house step by step to become the way you plan in your heart, fantasizing about the future and the happiness of your family every day here, all this is worth it.
Choose the right decoration plan
At present, the design/construction methods on the market are roughly divided into the following three kinds: First, the decoration company design + construction one-stop (half package/full package); Second, independent designer/design agency + decoration company/contractor; The third, own design + decoration company/contractor construction.
Generally , the decoration of the dim sum will choose the second, both to participate in the design, without spending too much time and energy. Choose these kinds of psychological expectations: the design cost is more. And the disconnection between design and construction is likely to cause the design scheme to not be implemented.
Look at the construction plan carefully, beware of the settlement list "calculation error"
The contract of the general decoration company is densely packed with dozens of pages of paper, and it is too big to see. The same is true of the decoration company we are looking for, plus every subdivision and note is really dazzling. Although it is very troublesome, I still suggest that you must read the decoration contract carefully, after all, the decoration process takes a long time and involves more personnel and processes. There will inevitably be some hiccups. This time, the contract is your most important leverage.
Hydropower planning is very important in the early stage
Because hydropower is a hidden project, the layout will affect the future use. If you do not consider it carefully, it is basically impossible to change it later, or it will cost a lot of money. Wire line grooving and wiring are also these if you do not understand must find a responsible electrician master to get you, generally find a good reputation, it is not bad.
Check wall and floor perpendicularity and flatness
The verticality and levelness of the wall are tested with a vertical measuring ruler. Plastered wall and tile surface may appear empty drum phenomenon. Therefore, it is necessary to carefully observe and check the empty drum phenomenon of the wall, so as to avoid the occurrence of wall ash and tile falling off in future life.
The acceptance of the ground decoration and the acceptance of the wall decoration are not very different, mainly to check the appearance and flatness. First of all, we need to check the appearance of the ground to see if there are problems such as color difference, cracks, and gaps. The second is to check the flatness of the ground, generally through the vertical detection ruler for detection. In addition, the kitchen balcony and other floor drain parts of the ground, but also need to carry out slope inspection to see whether the water is smooth without stagnation.
Water, circuit decoration acceptance
Electrical acceptance mainly includes several parts: electrical boxes, electrical appliances, switches and sockets inspection. Acceptance includes the following aspects: electrical box inspection, electrical inspection, switch socket inspection and so on.
Waterways include water supply engineering and drainage engineering. In the inspection of water supply engineering, pay attention to check its quality and water conditions. During acceptance, we must pay attention to check the quality and installation position of faucets, valves, water meters, etc., and check whether the water is normal.
After the toilet is waterproof, be sure to do 24 hours of closed water experiment. The closed water test is also called the water storage test, the water storage depth should not be less than 20mm, the water storage time is 24 hours, and the water surface is qualified if there is no significant drop.